Project details
Products and services included: CPS60S 60kVA Generator, ATS-100 Phase – 3PH, GENERATOR / UPS INSTALLATION, SAT, Commissioning, Freight
Project overview
In March of this year, we were contacted by a Charitable Organistion who were in search of a power system. They required a stand-by power supply for one of their branches in Barnsley. Six weeks later, we had their Generator fully installed on site and handed over to the client.


Project scope
The non-profit organisation recognised that it was a major health and safety concearn to have no backup power. If they were to experience a power cut, it could have had detrimental impact to their operations.
To gain a complete understanding of the client’s spec, we attended site for a site survey before providing a quote. With careful consideration, we opted for the CPS60S, CPS-powered diesel generator. This genset is 60kVA and housed into a robust, weatherproofed and soundproofed canopy. The set has a CPS QYI-224E alternator and ComAP Control Module.
We also provided an ATS-100 Phase – 3PH (Automatic Transfer Switch). This 100Amp ATS allows for seamless integration of power in the event of power failure. Providing convenience for the customer.
Before installing the systems on site, our enginner attended site for a pre-works survey to ensure that the site was prepared for the system installation.
WORKS COMPLETED
Once the site was fully prepared, we delivered the 60kVA geneset to site and began installation. After a sucessfull installation, we completed commissioning and a Site Acceptance Test. We conduct Site Acceptance Testing to fully ensure that the Generator is suitable and capable to do what it should do.
We then completed a full handover to the client, including training on various aspects of how to operate and maintain the system. Following this, we re attended to complete any snagging and answer any furether questions they may ahve had.
The CPS team was really proud to supply and install this 60kva system. We love helping our customers keep their businesses safer! We can only achieve this by being proactive and providing consistent factory and site performance!
Check out our social media pages or conatct us for more info on our turnkey solutions!
Related Projects
250kVA Rooftop Standby Power for the National Centre for a Children’s NHS Hospital
Client: NHS healthcare facility Sector: Healthcare / Critical Infrastructure Location...
3000kVA Synchronised Standby Power System for Critical NHS Energy Centre Infrastructure
Client: NHS healthcare facility Sector: Healthcare / Critical Infrastructure Location...
SuperSilent Power for NHS Hospital
Products and Services Included: 1000kVA Generator Solution Standby Power for NHS Hosp...
Need Expert Help?